_^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! hb```b``va`2~12 3+P!tw0dgCDu/8d.bdhp!M\FuN(#]y.cC756plr3':,u B\ Disconnects. Control. Shop drawings detailing fabrication and installation requirements for electrical equipment. Job No. Arrange for each installer of equipment that requires regular maintenance to meet with the Owner's personnel to provide instruction in proper operation and maintenance. Also include the address, phone number and contact person for each supplier. hb```x ,M[Vcv/?LyS:wIf{[zX#F2\3vdzDlLt0t0 h )@" 110wc {_1``Y P NESC (National Electrical Safety Code). This website uses cookies to improve your experience while you navigate through the website. SECTION 16010 - GENERAL PROVISIONS 1.0 GENERAL CONDITIONS: All sections under this Division shall be subject to the requirements of the Architect's General Conditions - UAP Doc. Complete inventory of spare parts and materials. Remove conduit, hangers, supports, etc. HWYsF~-*e{+*f4yHtOMR[.Sdh0~qzu8Udil;GiY"%g9'qn+6}Wj}=njO7lgcE}1- V. 0 Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. Services include: Electrical penetrations include conduits and cables. . DEMOLITION: Remove and dispose of all existing materials not required for re-use or reinstallation. Any conduit abandoned in concrete slabs, walls, or other inaccessible locations shall be left with a nylon pull wire. **"DHV1WtdRO2hK22K2*3e,jKs'{@Ee^hxNKK9 zBh9 SECTION 16010 BASIC ELECTRICAL REQUIREMENTS . 1835 0 obj <>/Filter/FlateDecode/ID[<436FD37774A5B745BAA68B131E232EA6>]/Index[1820 93]/Info 1819 0 R/Length 81/Prev 195435/Root 1821 0 R/Size 1913/Type/XRef/W[1 2 1]>>stream 2. 0 endstream endobj 575 0 obj <>stream Shut down. % Perform cutting, fitting, and patching of electrical equipment and materials required to: Uncover Work to provide for installation of ill timed Work. 4284 0 obj <>stream hbbd``b`$f n2 w}L %X0 8 Prepare floor plans, elevations, and details to indicate penetrations in floors, walls, and ceilings and their relationship to other penetrations and installations. M0*``mvle}vw$ms3s%)[Fpk, V7#`,kzp:dM b([0.@Sk8@KGq4EY2:":@DD L'czU4,f53( iX 89 Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas. Packaging: Premixed and factorypackaged. Contractor shall furnish manufacturer's electrical equipment of the types and sizes specified which has successfully operated for not less than the past two years, except where specific types are named by manufacturer and catalog number or designation under other Sections of the Contract Documents. Indicate scheduling, sequencing, movement, and positioning of large equipment into the building during construction. h. ELECTRICAL. 11-254 95% Construction Document Submission Phase January 03, 2012 BASIC ELECTRICAL REQUIREMENTS 260000 / = > ? Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. 8&Zdl6xHc`p(N:cy$f430o"NNN_r u2Mrf\[7Hcr hbbd``b` $V Fg $s6e"A?a)L:= S ` + 0000001182 00000 n General: Construct concrete housekeeping pads to support mechanical equipment were indicated and as detailed on the drawings and as specified herein. By closing this banner, or continuing to use this website, you consent to the use of cookies. 584 0 obj <>/Filter/FlateDecode/ID[<68D0A66D69CDF1FFF7626FF3652144DE><5293A0C1E7B0C14DBF1945BCD9C7F14E>]/Index[571 20]/Info 570 0 R/Length 71/Prev 500049/Root 572 0 R/Size 591/Type/XRef/W[1 2 1]>>stream service companies, and controlling agencies. Design Mix: 5,000psi (34.50MPa), twenty eight (28) day compressive strength. OSHA (Occupational Safety & Health Act). J{H5*aQDi!=GcN`H%{`8Zky:qr\a! Coordinate connection of electrical services. left on top of ceilings and ceiling tiles. These cookies will be stored in your browser only with your consent. Cleaning. qZ*`vC+6`tth?P^u^ 'EHC1ZK$q{)Q8E B. Installer of specialized systems such as Fire Alarms, telecommunication systems, etc. UMB Energized Work Permit: A UMB Energized Work Permit is required for any work on energized circuits or equipment. Place markers in corner of tile. Each section of raceway must contain an equipment grounding wire bonded at each end and sized as required. o}B UJV5tM|w{&3cO*vnIg\6u(A2(^`h``h` @y40u@$X #X(Rp@1f Concrete shall be 3,500 psi twenty-eight (28) day compressive strength concrete and reinforcement bars as specified in the architectural specifications. Installers' qualifications refer to the materials and methods required for the surface and building components being patched. WORK PERFORMANCE All electrical work must comply with the requirements of NFPA 70 (NEC), NFPA 70B, NFPA 70E, OSHA Part 1910 subpart J, OSHA Part 1910 subpart S and OSHA Part 1910 subpart K in addition to other references required by the contract. With super-finished raceways and controlled geometries, our premium design helps ensure consistent quality. Both riser and floor plan shall indicate address of devices where applicable. This Section of the Specifications and its accompanying Drawings are made The Architect/ Engineer will not perform any punch list verification until all items have been completed, initialed, dated and the list returned to the Architect/Engineer. Preliminary programming information. Hazards. The mark-ups shall be legibly marked in red pencil to show all changes and departures of the installation as compared with the original design. Approved substitutions, Contract Modifications, RFI responses and actual equipment and materials installed. Make all necessary investigations as to locations of utilities and all other matters which can affect the work. SECTION 16010 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 Description This Division includes the complete installation of power, control, instrumentation, wiring, lighting, and other electrical systems as specified in the Sections of Division 16. Prospective subcontractors under this section are cautioned that the unauthorized operation of electrical equipment or other control devices by their personnel can result in extremely serious consequences for which the contractor will be held accountable. Patch existing finished surfaces and building components using new materials matching existing materials and experienced Installers. TURF CLUB 16010-1 GENERAL PROVISIONS MASTER F:\WORDPROC\ZEIJOBS\883-001\16010 SECTION 16010 GENERAL PROVISIONS PART 1 - GENERAL Related Documents: Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to this section. hbbd```b``+XLVH&06K 0&_d9;H2b&Ff=~ 90 16 ELECTRICAL GENERAL REQUIREMENTS Section 16010 0 Provide forms for placement of grout, as required. while working on energized systems in accordance with NFPA 70E. Install equipment and materials in existing structures. %PDF-1.5 % hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I Using the UMB Standard O&M Manual Template referenced in Division 01 Closeout Procedures insert the submittal files include both a bookmark and tree structure for accessing each submittal file in the manual. 11275 0 obj <>/Filter/FlateDecode/ID[<1BCD9CA6C4893D4A874390606B4A9A2F>]/Index[11261 22]/Info 11260 0 R/Length 76/Prev 791633/Root 11262 0 R/Size 11283/Type/XRef/W[1 2 1]>>stream Single row deep groove ball bearings are particularly versatile, have low friction and are optimized for low noise and low vibration, which enables high rotational speeds. SCOPE OF WORK . DTW Works Master Specification Section 16061- Grounding -Primary Issued 2005/06/01 PART 1 GENERAL 1.1 RELATED SECTIONS .1 Section 16010 - Electrical General Requirements. <> This category only includes cookies that ensures basic functionalities and security features of the website. &%`T$cf:A5H(3Jy?'- ] Samples shall indicate applicable specification All work in Divisions 26, 27, and 28 shall comply with the latest version of following codes and regulations as adopted by the State of Maryland and the State Fire Marshal, unless otherwise specified. xref a$gd;F $ 0000002809 00000 n Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel]. If you want to know more or to change your cookie settings on your computer or device, please see our cookie policy. Corresponding floor plans showing only this particular system with conduit and wire runs between points. P}a WNd|2Svk=vq!xKv!`,8h@ ` 8`M9e D `TD>'5m4dZppSs$+{43 ]EY 896 0 obj <>/Filter/FlateDecode/ID[<4733E1E0B7D7784ABE416F9437B1A7ED><5C11778FF49F854BA974624463381FF3>]/Index[878 27]/Info 877 0 R/Length 92/Prev 228199/Root 879 0 R/Size 905/Type/XRef/W[1 3 1]>>stream endstream endobj startxref Properly store and handle all materials and equipment. The convenience socket outlet and exhaust fan shall have a cross section of 4mm and a circuit breaker (1 x 16 A + N) unless otherwise mentioned on drawings. OUTAGES For all work requiring an outage, the electrical contractor shall submit an outage request to the UMB Project Manager, using the UMB Standard Request for Outage Form which is available through the UMB Design and Construction Web Site at HYPERLINK "https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/" https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/ The existing mechanical/electrical systems shall remain operational unless turned off by University personnel during the construction of the project. For equipment requiring seasonal operation, perform instructions for other seasons at the same time. In default thereof, owner may have such work done and charge the cost of same to the contractor. SECTION 16010 . 904 0 obj <>stream NJ j5)'~# 4"{:k[k%nK0Er`@ stream Related Specification Sections include, but are not limited to, the following: 1. hbbd``b` $Z ~BARD0 !LAF10t' 0 The Contract Documents are a single integrateddocument, and as such all Specification Sections apply. &. to a point below the finished floors or behind finished walls and cap. Cut such items flush with masonry surfaces. Access panels and doors are specified in the Architectural Specifications. Show all access doors for concealed junction boxes devices. 0000002433 00000 n Cure placed grout according to manufacturer's printed instructions. Provide suitable cover plates for all recessed back boxes of equipment removed and not covered by new devices. 0000002587 00000 n SECTION 16010 - GENERAL PROVISIONS. Do not include this data in the Product Submittals. PART 2 PRODUCTS LISTED MANUFACTURERS: Listed Manufacturers: The listed manufacturers indicated in Part 2 of each specification section as the basis of design represents the minimum level of quality for materials and equipment that is acceptable to UMB. }SC8/(|X.8\NspWb].uHh8w/0>uxEu$H>THbhOZd4 Coordinate installation of large equipment requiring positioning prior to closing in the building. Provide installation in accordance with recognized trade organizations and standards: NEMA. They accommodate radial and axial loads in both directions, are easy to mount, and require less maintenance than many other bearing types. Coordinate connection of electrical systems with exterior underground and overhead utilities and services. FINAL CLEANING General: General cleaning during construction is required by the General Conditions and included in Section Temporary Facilities. EN. Existing Construction: All new service penetrations through existing rated assemblies shall be provided with a pipe sleeve and sealant materials. 611.0 Acceptance Test 612.0 product data and shall indicate applicable specification section and item numbers. Cutting and patching. Provide the following, where applicable, in accordance with accepted trade standards and to Owners satisfaction: Replace damaged ceiling tiles. Safety procedures. This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . Access shall be as required by code and/or as determined by the Architect and Engineer. endstream endobj 2010 0 obj <>stream ELECTRICAL GENERAL PROVISIONS . SECTION 16010 - GENERAL PROVISIONS SECTION INDEX 1.0 General Conditions 12.0 General Description 13.0 Work Included 24.0 Codes, Inspection, Permits and Fees 35.0 Record Drawings 36.0 Shop Drawings, Samples and Other Submittals 47.0 Coordination 58.0 Minor Modifications 59.0 Guarantee 6 10.0 Approvals, Substitutions, Etc. State of Maryland Fire Prevention Code. 3. No additional compensation will be made to the contractor as a result of his failure to familiarize himself with the existing conditions under which the work must be performed. 11261 0 obj <> endobj Verify all dimensions by field measurements. unless otherwise noted. Section 16010 General Electrical Provisions Section 16120 Wire and Cables Section 16130 Wiring Devices Section 16160 Pilot Devices . vol. DEMONSTRATION AND INSTRUCTIONS Demonstrate operation and maintenance of equipment and systems to Owners personnel a minimum two (2) weeks prior to date of final inspection. Disconnect installed work as specified for testing. 0000005420 00000 n See Specification Division 01 for general requirements. o Part Number 16010, Narrow Section Ball Bearings (16000, 16100). endobj Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. PROJECT OPERATION AND MAINTENANCE MANUAL ELECTRONIC FILES Project O & M Manual File: The project OM Manual shall include one (1) electronic copy of each approved submittal and any manufacturers maintenance manuals, and all warranty certificates included in Divisions 26, 27, & 28. Test data for equipment, shielded cables and supply voltage shall be submitted to the District. GUARANTEE/WARRANTY: All materials, equipment, etc. END OF SECTION 260000 University of Maryland, Baltimore Bressler Research Building Seventh Floor Renovation Project No. BICSI and NICET certification, where required by these specifications. Specifications and Drawings are prepared in abbreviated form and includes incomplete sentences. Coordination Effort: This coordination effort shall include detailing major elements, components, and systems of electrical equipment and materials in relationship with other systems, installations, and building components. PROJECT PUNCH OUT Architect/Engineer will perform punch out reviews and will provide the Contractor with a list of punch list items to be completed before contract close out. endobj endstream endobj 4189 0 obj <. The following list shall be used as a guide only: Equipment such as transformers, generators, etc. %%EOF See underlined texts for Edits. ph p h8 B* Size and location of all electrical panels. B. The drawings and specifications shall be followed in layout of work. Each and every punch list item shall be initialed and dated by the Contractor when the work is complete. Browse Part Number 16010, Narrow Section Ball Bearings (16000, 16100) in the The Timken Company catalog including Part Number,Item Name,Description,Clearance,Bore Size d,Features,Outside Diameter D,Outside Ring Width B,Radius Rs min,Cr - Dynamic Load All adjustments and modifications shall be provided by the bidder and appropriate subcontractors at no additional cost to the project. 4. %%EOF xb```f``Z$31 P9&0`(*k^?f(]A 33$M?sOXiU>0seuA[!TC@EBt[lytx*%g K NZI9D&\m; ,fNgr\ r9T^LUYn~K6F.%ragg,n:a9id""$M])2bISPyb`6``:EZc `2p%KGS;^eNLM\|j P}e`N 0o2304@ KB 878 0 obj <> endobj Div. The work to be done under this Division of the Specifications consists of the GROUT Grout shall be non-shrink, high strength type, free of iron or chlorides and suitable for use in contact with all metals, without caps or other protective finishes complying with ASTMC1107, GradeB and the following: Characteristics: Post hardening, volume adjusting, dry, hydraulic cement grout, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications. For equipment rough-in requirements see specifications for electrical equipment. 0000003103 00000 n Refer to specification Section 16010 - "Basic Electrical Requirements: for complete work scope. 4188 0 obj <> endobj Maintenance agreements and similar continuing commitments. 2020 0 obj <>stream The electrical installer shall utilize a full time project foreman in charge of all electrical work. Include the following: Planned electrical systems layout, including conduit elbow radii and accessories. APPROVED EQUAL EQUIPMENT LAYOUTS Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. Reference letters from minimum of three (3) registered professional engineers, general contractors, building owners, explaining proficiency, quality of work, or other attribute on projects of similar size or substance. It is mandatory to procure user consent prior to running these cookies on your website. Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are of importance to the efficient flow of the Work, including (but not necessarily limited to) the following: Indicate the proposed locations of electrical equipment, and materials. mHs00\%Q` Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. 4 0 obj %%EOF The Engineer shall decide on the item and manner in which the work shall be provided. Operation. %%EOF Machine name and specification section number of driven machine. Ends shall be capped with push plugs for future use. Reimbursement shall be made by deducting the Architect/Engineer fee from the Contractor's final payment. 0 1.2 Page 1 of 4 REFERENCES .1 American National Standards Institute/Institute of Electrical and Electronics Engineers (ANSI/IEEE). F. Supply Voltage .2 Section 01810 -Commissioning. ADA (American with Disabilities Act). 264 0 obj <> endobj 0000000596 00000 n [l*/ Trouble shooting. SUMMARY This Section includes general administrative and procedural requirements, as well as the following basic electrical materials and methods: Referenced organizations and codes Site visit Outages Installers qualifications Work performance Submittals Quality assurance Delivery storage and handling Sequencing and scheduling Variances Guarantee/warranty Listed manufacturers Approved equal equipment layouts Fire stops & smoke seals for wall & floor sleeve applications Coordination drawings Construction record documents Operation and Maintenance manuals electronic files Concrete housekeeping pads Grout Roughins Electrical installations. Emergency operations. startxref In addition to the above statement the Guarantee/Warranty Period shall include all labor cost related to all warranty work. Examples of Sub Systems: Normal Power. Any work covered prior to any inspection in a manner which, in the inspector's opinion, precludes a complete inspection shall be uncovered at the installers cost. CUTTING, WELDING, BURNING Before the contractor and/or any sub-contractor commences any cutting, welding, burning or other type of hot work at UMB, the contractor shall contact the UMB Fire Marshals Office located @ 620 W. Lexington Street, 6th Floor, Room 6113 or by phone @ 1-410-706-3494 to obtain a hot work permit. shall meet the requirements of the associated spec section(s). HSMo@Wq~HU8 jPYqz0NAjFgvlwv=~|vjj*5MY}n`yQ?aLu:#heF{L[}:n! /C\_7sHsuHp$c1X?So0u*dMLeqi81cx,B2@(@>Nde7a-KZi:%A o#=drlbI6. %PDF-1.5 % Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. Work with the other trades to ensure the material and equipment installed as part on the electrical system will not be in conflict with the installation of material and equipment by the other trade contractors. ?\ 2j0D,xl>Kc2)b01UBu0% ## d X%XIL New Construction: All new penetrations shall be provided with a pipe sleeve and sealant materials. !y-P+O`_ )q|ero-UPO]GmlQ^+RDdi*>Z Review contents of manual and video with personnel in detail to explain all aspects of operation and maintenance. XB^c*x=.l0 r Samples shall indicate applicable specification section number and item numbers within that section. NECA (National Electrical Contractors Association). Economy and efficiency adjustments. BASIC ELECTRICAL REQUIREMENTS . Supplementary Conditions and Division-1 Specification Sections, apply to this Section. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces. Adjustment. The contractor shall submit detailed riser diagrams detailing point-by-point connections. The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. The contractor shall include in his price the cost of all premium time required for outages and other work which interferes with the normal use of the building, which will be performed, in most cases, during other than normal work time and at the convenience of the University. Effective energy utilization. L1)Tj4d v"1s%H"r$-j` ,}# Avoid air entrapment when placing grout. In addition to the requirements specified in Division 01, indicate the following installed conditions: Conduit and wire runs between the points Equipment locations (exposed and concealed), dimensioned from prominent building lines. The work plan must include procedures to be used on and near the live electrical equipment, barriers to be installed, and safety equipment to be used and exit pathways. General Specification for Electrical Works Abu Dhabi Sewerage Services Company ADSSC/GSEW Division 16 Section 16010 Electromagnetic Compatibility (EMC) Rev: 02 Jan. 2011 Page 6 of 7 6. Use operation and maintenance manuals and video as basis of instruction. Patch holes and penetrations in wood, masonry and plaster. 5. 1.2 REQUIREMENTS OF REGULATORY AGENCIES AND STANDARDS Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." Omission of words or phrases such as "the Contractor shall", "as shown on Provide an index chart for identification. PART 1 - GENERAL . PART 1 GENERAL RELATED DOCUMENTS Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section and all other Electrical Specification Sections. But opting out of some of these cookies may have an effect on your browsing experience. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. 0000001264 00000 n 0000000016 00000 n Install all components and equipment per manufacturers written instructions. Project Area: The project area shall include the finished spaces and related sections of the utility shafts within the project area footprint. All submitted materials and equipment are subject to approval by the A/E and UMB. Energized electrical conductors and circuit parts to which an employee might be exposed shall be put into an electrically safe work condition before an employee performs work any time the employee is within the limited approach boundary or, where an increased risk of injury from an exposure to an arc flash hazard exists. The Terms Listed and Labeled: As defined in the National Electrical Code, Article 100. Remove conduit, hangers, supports, etc. Installers' qualifications refer to the materials and methods required for the surface and building components being patched. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. Any defects in workmanship, materials, or performance which appear within the guarantee period shall be corrected by the contractor without cost to the owner, within a reasonable time, to be specified by UMB. At a minimum, prepare coordination drawings for all mechanical rooms, electrical rooms and substation rooms. 571 0 obj <> endobj endstream endobj startxref 2.0 GENERAL DESCRIPTION: A. Div. EU PRODUCT DIRECTIVES a) The EU Product Directives deal with large families of products or horizontal risks, such as those addressed in the Electromagnetic 16010 - 1 . %PDF-1.5 CONCRETE HOUSEKEEPING PADS Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. Where coordination requirements conflict with individual system requirements, refer conflict to UMB. uI0b}q:_H:N=1pC_$;1j8OP$\;MX=+M36XzN6>t+u>fct1*l{m pe SECTION 16010 . &F >`>a$gd$ ^ gd;F $ 264 15 See Architectural Specification Division 07, Section Penetration Firestopping for sealant material requirements. Where access is by means of lift out ceiling tiles or panels mark access each panel using small color coded or numbered tabs. 8 d X 6 D Z Z Z Z r" T " " $ D " 2" 2" @ " " Z Z 6% 6% 6% " F Z Z 6% " 6% 6% " l C Z F4 8# 3 v ( 0 X # C C P 0 " " 6% " " " " " $ " " " X " " " " " " " " " " " " " X f : SECTION 260000 BASIC ELECTRICAL REQUIREMENTS Latest Update 03-10-2022.
Mathilda Mobile Legends, Articles S
specification section 16010 2023