Firm: CSA Group NY Architects and Engineers, P.C. To help root out this information, RSP, the Office of Legal Affairs, and the IRB have put together the attached supplemental questionnaire. 161 0 obj <>stream Capstone Strategies served the MTAs six agencies as a business transformation advisor focusing on Process Improvement, System Integration and Robotic Process Automation (RPA) for Public Service agencies. With universities operating on the global stage, additional templates are needed to do international transfers. Remedies). In these instances, the researcher should connect with their contact at WARF, or mta@warf.org, to coordinate the agreement around the distribution of the material to the recipient. An MTA-issued notice of award letter or blanket order release form may be used in lieu of a PO notifying Vendor that it has been awarded the Contract . WiCell contacts PI to inform that all documentation has been completed. Expand All Title:Professional and Technical Staffing and Services (Non-Federal) Finally, the Simple Letter Agreement and the UBMTA were developed by NIH and are really aimed at domestic transfers. The privilege has come from working with a professional staff that held us to consistent standards of excellence as we worked to make the MTA better. Virtual opening for these events will be conducted. Jackson Avenue Station, Flushing Line, IRT, in the Borough of Queens, D81433: Project Management Consultant (PMC) Services for the ADA Accessibility Upgrade and Station Improvements of Eight (8) Stations in the Boroughs of Brooklyn, Queens, Manhattan, and the Bronx, C52147: Furnishing & Installing Electronic Security Systems (ESS) at the Wall St Station, Lexington Avenue Line, IRT Division and the Broad St Station, Nassau Loop Line, BMT Division in the Borough of Manhattan, CM030: Design-Build Services for Passenger Experience Enhancements and Finish Detailing for the East Side Access Project, CH058B: Design/Build Services for East Bound Re-Route Construction for the East Side Access Project, A37360 (SBMP): Street Stair Repairs at Rector Street Station, Manhattan, A37354 (SBMP): Street Stairs Repairs S6/M7AB at Ralph Avenue Station, Brooklyn, A37347: Elevated Street Stair Repairs S7/M13, S8/M10 at Brighton Beach Station, Brighton Line (BMT), in the Borough of Brooklyn, C34857: Sandy Repairs, Rockaway Line Wrap-Up, B Division, in the Borough of Queens, MN-143286: SBMP Beacon/Cold Spring Paving, 6377: Blue Point Yard Parking Lot Reconstruction, 6397: TVM Shelter Shed at 2 Stations--Brentwood and Deer Park Stations, RK-58: Randalls Island Roof Replacements and Fall Protection (SBMP), W81119-1: Ultra-Wideband (UWB) based Train Control System Pilot Program, W81119-2: Ultra-Wideband (UWB) based Train Control System Pilot Program, R50464: Replacement of Heating System at Main Street/Flushing Station, Flushing Line, in the Borough of Queens, E-34025R: Replacement of Two (2) Hydraulic Elevators at Grand Central Station Lexington Line (IRT); and Communications & Electrical Work for One (1) Hydraulic Elevator on the Flushing Line in the Borough of Manhattan, C43052: Upgrade of Communication Room 372A, Longwood Avenue Station, Borough of the Bronx, C30401: Rehabilitation of Deep Wells & Control Upgrade on the Nostrand Avenue Line in the Borough of Brooklyn, E34025R: Replacement of Two (2) Hydraulic Elevators at Grand Central Station Lexington Line (IRT); and Communication & Electrical Work for One (1) Hydraulic Elevator on the Flushing Line in the Borough of Manhattan, CM020 (SBMP): 37th Street Civil Work and Salvadoran Consulate Sidewalk Beam Repair, RK-PT: Cleaning and Painting of the Manhattan Plaza and Ramps at the Robert F. Kennedy Bridge, MP-PTX: Painting of Upper-Level Steel Work at the Marine Parkway Bridge, A37334: Subway Street Stairs at Grand Avenue-Newtown Station, Broadway Line (BMT), Queens, R50463: Installation of HVAC System at Forest Hills -71st Avenue Station, Queens Line (IND) in the Borough of Queens, C43053: Upgrade of Communication Room #343, Nostrand Avenue Station, Eastern Parkway Line, Brooklyn, B40611: Chassis Wash and Lift Replacement at College Point Bus Depot, Queens, E-34028: Replacement of 8 Traction Elevators at Various Locations (Clark Street), GEC-20-3042: Construction Administration and Inspection Services for Project RK-PT, Cleaning and Painting of the Manhattan Plaza and Ramps at the Robert F. Kennedy Bridge, C40247: Upgrade of CNG (Compressed Natural Gas) Facility Equipment at Spring Creek Bus Depot in the Borough of Brooklyn, E31713: Fan Plant Damper System Rehabilitation at Seven (7) Locations in the Boroughs of Brooklyn and Queens, P36692: Miscellaneous Work at Concourse East 144th Street Substation Roof & Enclosure in the Bronx, C48721: Structural Repairs of Ventilators between Stations, Concourse Line (IND), from E 198th Street to E 205th Street in the Borough of the Bronx, A37671:Ventilator Reconstruction at E. 138th Street Grand Concourse Station on the Jerome Avenue Line (IRT), R50466: Replacement of Heating System at Retail Stores at 1720 Church Avenue, Brooklyn, VN-X4: Design Build Services for Installation of the Safety Fence on the Upper and Lower Roadways at the Verrazano-Narrows Bridge, 6392: Installation of Foundations and Platforms for Signal Huts, A-37489: Digital Urban Panel Support/Stair Finishing @ Bedford Ave Station & 1st Ave Station, MN135847: Construction Supervision & Inspection Services for GCT & East Side Access Unified Trash Facility and the FCC/SMO Reconfiguration, MS896: Consultant Services to Develop and Implement MBE, WBE and SDVOB Outreach Program, A37151: Design-Build Services for Accessibility Upgrades at Eight Stations, 600000000027374: Comprehensive Maintenance, Repair and Inspection of Elevators at Eight Stations, C52141: Furnishing and Installing Electronic Security Systems at the 59th Street Columbus Circle Complex, 6355: Replacement of Ocean Avenue Substation, P36704: Replace High Tension Switchgear and Flood Mitigation at Montague Furman Substation in Brooklyn, GEC-20-3041: General Engineering Construction Administration and Inspection Services for Project RK-07 Ph1A, Structural Repairs at the RFK Bridge (Category B1 Line Structures), C40276: Window Replacement at JFK Bus Depot, C40275: Storerooms and Overall Reconfiguration at LaGuardia Bus Depot, E30512: Replace 8 Escalators 125th, Pelham Bay Park & Pelham Parkway, 181st Stations in Manhattan and the Bronx, E34026: Replace (11) Hydraulic Elevators at Various Locations in Manhattan, Brooklyn & Queens, W47019: Furnishing, Installing, and Testing Connection-Oriented Ethernet: Phase 3B at various locations, A37700: Furnishing and Installing Mechanical Closure Devices at Multiple Locations, C40274: Rehabilitation and Facility Upgrade at College Point Bus Depot (Queens), C30844-51: Indefinite Quantity Asbestos Abatement and Other Environmental Remediation Services, CH063: Design/Build Services for Harold Catenary Construction for the East Side Access Project, PS898: Environmental Engineering Consulting Services for Penn Station South Expansion, S33933: Code Cable Replacement on the Broadway/7th Avenue Line, IRT, in the borough of Manhattan, S33932: Life Cycle Replacement of Code System Phase I, Jamaica & Myrtle Avenue Lines, S33931: Life Cycle Replacement of Wheel Detector (WD) Speed Enforcement Systems, C52154: Installation of PID Box and Cables-CCTV at 18th Street Station, Manhattan, A31750E: Design and Construction of Accessibility Upgrades at 149th Street-Grand Concourse Complex, A37332: Street Stair Repairs S4/P6 at Prince St. Station, Broadway Line, BMT, Manhattan, P36444: Design-Build Services for the Rutgers Tube Rehab, C52153:Furnishing and Installing Passenger Identification (PID) CCTV System at 23rd Street Station, in the Borough of Manhattan, A37330: Subway Street Stair Components at Canal Street - 8th Avenue, Manhattan, C52152: Installation of PID Box and Cables - CCTV at 28th Street Station, Manhattan, C48703: Line Structure Component Repair Eastern Parkway Line (IRT), Brooklyn, A37328: Remedial Structural Work at Street Stairs S1 & S4 at 75th ST Elderts Lane & S4 at Cypress Hills Station, Jamaica (BMT), A37327 : Remedial Structural Work St. Stairs S1, S3, S4 at Woodhaven Blvd.& S1/M1, S2 at 85th Street Stations, Jamaica Line, 6353: Design-Build Services for Belmont Park Redevelopment of Elmont Station, A31750D: Design and Construction of Accessibility Upgrades at Livonia Avenue Station on the Canarsie Line in the Borough of Brooklyn (Design-Build), PS875: Development of a Master Plan for Penn Station, PS877: Project Management Consulting Services for the New York Penn Station LIRR Train Hall Renovation Project, PS883: Environmental Compliance and Engineering Services for the Penn Station Access Project, MC881A: Water Infiltration Mitigation Services on an AS-Needed Basis, PS864: General Engineering Consultant Services for the Penn Station Access Project, C-34287: Construction of MTA Police Department District 9 Building, CH058A: Harold Trackwork Part 4 B/C Approach Structure of the East Side Access Project, PS865-1 PS865-34: Professional and Technical Staffing and Services (Non-Federal), CS086: Tunnels Systems Package 2 Signal Installation and Testing for the East Side Access Project, PS866A PS866Z: Professional and Technical Staffing and Services (Federal), CH057D: Harold Trackwork Part 3 for the East Side Access Project, PS862-A to PS866Z: Independent Compliance Monitor, 6240: Design-Build Services for the Long Island Rail Road Expansion Project. Some of the core projects that will be awarded in 2020 as part of the Metropolitan Transportation Authoritys (MTA) $54.8-billion 2020-2024 Capital Program have been announced by MTA President of Construction and DevelopmentJannoLieber. Many MTAs restrict use of the materials to internal research or non-commercial purposes. This is a 27-month contract for an estimated cost of $37 million, with the contract awardee providing all planning, design and engineering services to comply with MTA Construction and Development . A Material Transfer Agreement (MTA) is a contract that establishes terms and conditions governing the transfer of research-related materials between the University and another institution or company. The agreement restricts the use of the materials to not-for-profit research purposes only, and prohibits redistribution of the material without the consent of the original provider. Gonzer Associates Firm:Five Star/Comstock JV :914-885-1515, 917-583-4703, D81434: PMC for Flushing Bundle Station Renewal & Thru Span Rehab at 61st Station Woodside Station, Replacing 4 Escalators (1 at 61st-Woodside and 3 at 74th -Roosevelt Ave), Overcoating Track Component from 48th to 72nd St on Flushing Line +Station Renewal at 52nd St, 69th St, 82nd St, 103rd St, and 111th St stations on Flushing Line, Award Amount: Base Contract: $97,537,578.48, Option: $17,035,237.38, Total: $114,572,815.86, DBE/M/WBE/SDVOB Goal: MBE 12% / WBE 12% / SDVOB 1%, Firm Phone No. Allied Universal Protection Services inc. From WARF to the providers of the material to the funders of the research, there are many interests that pull on UW-Madison. 387704-GS57 - Plumbing Repair and Installation - As Needed, 361420-GS57 - Maintenance and Repair of Elevators and Dumbwaiters, 400094 - Maintenance and Support for Long Island Rail Road (LIRR) Building Management System, 376519 - Inspection Maintenance and Repair of Halon Fire Suppression System, 372281 - Maintenance Of Mobile Pressure Wash Units for NYCT facilities, 383489 - Design, Furnish, Install, Lease, Fire, Burglar, CCTV and Access Control Systems, 389059 - Year Maintenance Support Contract for Beacon System + 2 One Year Options, 389768 - IT Product Management Agile Transformation, 393072 - Purchase a minimum of one (1) server and up to sixty (60) Video management Servers. Governor Kathy Hochul today announced that the Metropolitan Transportation Authority (MTA) has approved a design-build contract for the Penn Station Access Project, which will provide direct Metro-North service from the Bronx, Westchester and Connecticut to Penn Station and Manhattan's west side. Once on the MTA Portal click on the . Line, IRT, in the Bronx, C43061R: Upgrade Communication Room MR #115, 8th Ave./Canarsie Line, A37711: Repair of Subway Street Stair S2 at the 28th Street Station, Broadway Line, Manhattan, A37713: Repair of Subway Street Stair S1/P1 at the Parkside Avenue Station, Brighton Line, Brooklyn, C43065R: Upgrade Communication Room #7 MR #334 at Clark Street, Clark Street Line, B62048: Eltingville Park & Ride Expansion, A46030: Bundle to include 61st-Woodside, 4 Escalators/Flushing and 48th - 72nd Overcoating/Track Level Components, P36708: New Substation at Canal Street / 8th Avenue, A37719: Repair of Subway Street Stair at Dyckman Street Station, Manhattan, E30641: Design-Build Services to Replace 17 Escalators at 6 Stations Systemwide, VNM-403: (SBMP) Engineering Trailer Rehabilitation at the Verrazzano-Narrows Bridge Service Building, A37718: Repair of Subway Street Stair at 205th Street Station, the Bronx, A37727: Repair of Subway Street Stair S1 at the 23rd Street Station, Broadway/7th Av. Please keep these consideration in mind as you are pursuing the receipt of materials. Quick discussions with both the commercial entity and the researcher can help us determine how best to handle the transfer. The MTA spends over$7 billion annually on procurement, ranging from office supplies and market research to railcars and construction contracts. As we invest in our regions infrastructure we must also invest in these often-excluded diverse entrepreneurs. Management Concept Systems & Services, Inc. (732) 203-9600 Lancesoft Inc. Set Asides permit the reservation in whole or in part certain procurements for SDVOBs when two or more NYS Certified SDVOBs are available and can provide the necessary construction, construction services, technology, commodities, products and other classifications to meet state agencies/authorities form, function and utility. Faithful + Gould, Inc. (732) 995-6320 A detailed project list is availableon MTAs website. If applicable, whether we received verification from IRB that sharing of the materials is allowed under the applicable protocol/consent forms. :516-644-9481,718-413-2123, Firm Phone No. MP Engineer, P.C. The MTA and other tolling agencies in New York, including the state thruway authority, have for years relied on one firm, Conduent Inc., to manage all of their tolling operations. Two of the firms -- QED National, an NYS-certified WBE who received 64 assignments totaling $12.4 million and Capstone Strategy Group LLC, an NYS-certified MBE, who received 33 assignments totaling $6.1 million -- have been strong voices for the MWBE community, working with elected officials to get further legislation passed to increase diversity thresholds. If the material to be shared was derived from human subjects under an approved IRB protocol or from patients for clinical purposes, we ask that this supplemental questionnaire be completed and uploaded to the WISPER record. The transit authority awarded a design contract to Michael Baker International, Inc. to design accessibility upgrades in agreeance with the Americans with Disabilities Act at three of its Broad . Rotator Staffing If you do not know your Vendor ID, have questions about the MTA Portal or Registration, call the MTA Business Service Center at 646-376-0123 - Option 3, Monday - Friday, 8:30AM - 5:00PM, or by email bscservice@mtabsc.org. Operation and Maintenance - Industrial Wastewater Pretreatment Facility, To be added to the Bidders List - sign up using. Sharing material from human subjects requires a bit more care than sharing of other materials. Firm: Thales Transport and Security Inc. Firm: Hardesty & Hanover Construction Services, Firm: El Sol Contracting/ES II Enterprises, A Joint Venture. If materials have been assigned to WARF, UW does not have the legal right to distribute them without WARFs consent, and often WARF will need to negotiate a license with the requestor first. We no longer support this browser, so parts of the site might not work as you expect them to. Aptim Engineering New York, P.C. Atlantic Partners II Below are some items to keep in mind when receiving material or sending material to others: Once on the MTA Portal click on the Vendor Sign-In Registration. www.masstransitmag.com is using a security service for protection against online attacks. Firm Phone #: (212) 779-0900 MTA Headquarters is soliciting the below INQs. Once complete, receive materials from investigator. Last updated August 29th, 2022. . WARF generally uses the UBMTA for such transfers, and it can be a quick and easy process for all involved. 1.21. Component orders. DBE Goal: 20% Working with the MTA has been both a privilege and an opportunity,said Dwight McLeod, CEO, Capstone Strategy Group. Why and When would you need or want an MTA? The agreement under which we obtained the materials my prevent us from further distributing them, or may impose specific terms on how and to whom we may further distribute the materials or modifications of the materials. If you do not know your Vendor ID, have questions about the MTA Portal or Registration, call the MTA Business Service Center at 646-376-0123 - Option 3, Monday - Friday, 8:30AM - 5:00PM, or by email bscservice@mtabsc.org. If you wish to attend virtually please email BSCVPROCSOL@MTABSC.ORG by Noon one day before the Public Opening Date for further instructions on the bid opening details. This method - As the largest transportation network in North America it is important that we expand contract opportunities for our pool of minority and women entrepreneurs,said MTA Chief Diversity & Inclusion Officer Michael J. Garner. PMA Consultants, LLC (917) 843-7251 The CBTC . An MTA between a providing entity and a receiving entity should be fully-executed before any materials are sent or received. Firms & Phone #:A. G. Consulting Engineers, P.C. Novalink Solutions, LLC (770) 239-1641 Lin International, WSP USA, Inc. Award Amount: $200 Million Aggregate (est.). These IT assignments are the result of a contract that was originally awarded in 2016. These provisions would then conflict with the terms of the material being requested. Their programmers, IT security consultants, system analysts and other service providers helped advance many of the MTAs critical programs. The IT sector is just one of many where we will be looking at a more diverse pool of quality talent to advance the operations of the MTA.. With this checklist completed, RSP can help direct which template agreement to use for the specific material, notify other campus constituents that may need to weigh in on the material transfer, and ensure that UW-Madison is compliant with any requirements that may exist for the specific material. Infosys International, Inc. (516) 982-1213 The UBMTA is only for transfers between non-profit/academic organizations. :718-439-0049,917-748-7077. Applicants who want to secure sponsor certification from MTA must be active MTA members or dependent on an active . the scope of each contract. Become Registered Living Wage Policy and Retention for Service Contracts A firm must register at www.mymta.info to gain access to the solicitation (s) listed below. University of Wisconsin Madison MTAs often include restrictions on how and to whom materials (and often modifications) can be shared. The Southeastern Pennsylvania Transportation Authority (SEPTA) awarded a $6,542,831 contract to Michael Baker International, Inc. to advance accessibility improvements at three subway stations. DBE Goal: 20% These MTAs should be used for the specific material identified when additional protections are needed. Make materials and data available on website for order. K.S. MTA- Headquarters will be conducting these procurements through a secure online portal. Any project valued at more than $500,000 is to be competitively procured as a separate contract. 21 North Park Street, Suite 6301 Contract Award: Scrap, surplus material and obsolete equipment are sold to the highest responsive and responsible bidder. Through the States MWBE program we have created a larger pool of diverse qualified businesses who can now compete, win and complete our projects, safely, timely and within budget., We are reaching our goal of having a substantial amount of goods and services come from minority-and-women-owned businesses and I couldnt be prouder of my team and Mike Garner and his staff,said MTA Chief Procurement OfficerKuvershenAyer. : (212) 973-3190, (212) 896-3004, (212) 542-6165, (646) 677-2323, (610) 248- 9358, (646) 284-1266, (814) 591-9160, (332) 209-2015, (212) 266-8393, (212) 330-6277, (646) 602-5839, (646) 943-6764, (646) 264-2524, (212)465-5206, Title: Design-Build Services for Passenger Experience Enhancements and Finish Detailing for the East Side Access Project, Title: Design/Build Services for East Bound Re-Route Construction for the East Side Access Project, Firm: Railroad-Michels Joint Venture, LLC, Firm: Navillus Tile Inc. d/b/a Navillus Contracting, Title: Subway Street Stairs at Grand Avenue-Newtown Station, Broadway Line (BMT), Queens, Title: Installation of HVAC System at Forest Hills -71st Avenue Station, Queens Line (IND) in the Borough of Queens, Title: Upgrade of Communication Room #343, Nostrand Avenue Station, Eastern Parkway Line, Brooklyn, Title: Chassis Wash and Lift Replacement at College Point Bus Depot, Queens, Title: Fan Plant Damper System Rehabilitation at Seven (7) Locations in the Boroughs of Brooklyn and Queens. As a best procurement practice in awarding capital construction contracts, the MTA requires pre-award background checks to determine whether prospective contractors have had poor performance records on prior MTA contracts. This agreement is used for the transfer of biological materials and requires both institutions to be signatories to the UBMTA Master Agreement.
Susan Calman Campervan, Council Properties To Rent In Bromyard, Articles M
mta contract awards 2023